top of page

88 results found with an empty search

  • Planning Success

    Planning permission has been granted for one of the latest Facit Homes, this time just outside Hemel Hempstead in Hertfordshire. This 4 bed property is set to replace a ramshackle old bungalow and was quite a planning challenge; together with the client we decided to locate the new home on another part of her large site, as well as substantially increase the GIA. From its previously awkward position among some light industrial buildings, the new home will now nestle next to some existing properties at the edge of the site, joining up with them to create a gentle cluster of dwellings. A combination of careful and sensitive design work, a well considered strategy and a robust planning submission meant that we achieved permission first time for exactly what our client wanted. A great team effort. Work is now fully underway on the technical design of the building, groundworks tenders are out and we plan to get on site as quickly as possible. Watch this space for more updates.

  • Build It Awards 2016 Shortlist

    Facit Homes is delighted that our project at Maryon Road for Terry & Mickey has been shortlisted for a Build It Award. As our client Terry says “We think Facit must be a clear winner of course!” Find out more about the project here – Terry & Mickey https://builditawards.co.uk/

  • Moved in and ready to live

    There’s always a real sense of achievement when we hand over one of our custom build properties to its new owner. When our clients Jim and Mary came to get the keys and walk around with our quantity surveyor on the day of completion, the sun was out and the whole house was glowing in the evening light. It couldn’t have looked better for their arrival so handing over the keys was a very satisfying moment. In the run up to completion and handover, it was a busy few weeks with all of the final finishes and details being completed. There was a tense moment waiting for some lights that were being shipped from Italy, but they arrived on time which meant that they were installed succesfully. Jim and Mary’s removal company started moving their boxes in the following day – there was no hanging around. It seems a long time ago that we demolished the existing bungalow on the site in late June last year and the Facit Chassis started going up in early August. We’ve handed the keys over to the client right on schedule. Looking back, the installation of the final piece of our unique chassis roof was certainly a highlight and suddenly we all had a feel for the final form of the building. Watching all the internal walls go in and seeing the conversion of our digital model that we had walked through on the screen so many times into a physical space was a really satisfying moment. We had to accelerate part of the programme to allow for the installation of the Photo Voltaic system before the feed in tariff changed. That meant rearranging the construction sequence but it was worth it to guarantee the best performance for the client. Once we have handed over the keys we are still on call to answer any questions the new owners may have so it’s been good to go back and see how they are settling in and making the new house their home. Their dog is certainly enjoying the underfloor heating. While we move onto our next commission it’s good to know that the new owners are starting the next chapter of their lives in a highly specified unique home.

  • Grand Designs Live 2016

    Come and visit us at Grand Designs Live from 30 April – 8 May to find out more about our custom designed homes. You can find us in the Grand Build Hall at Stand B17. Speak to one of the team about your project at the stand or book an ‘Ask An Expert’ session with our Founder,  Bruce Bell  or Director of Architecture, George Legg . https://www.granddesignslive.com/

bottom of page